A tilting vibratory hammer can pick up a horizontally stored tube. This is a unique, time-saving idea! With this in mind, we designed an upending solution. The vibration process can start immediately after picking up the horizontal tube, tilting into a vertical position and lifting and positioning. Doing this all at once not only saves a lot of time; it also saves you extra lifting-handling capacity.
- Safe working Picking up, tilting, lifting and installation in one sequence
- Extensive range Add-on tool, also after market
- Highly efficient for offshore as nearshore as onshore projects
Not only have foundations become larger, caissons bigger in diameter but als the piles are getting longer and wider. The result of this is a change in demand for wider range of hammers. Also pile handling becomes more important. Dieseko Group responds to this demand by introducing innovative solutions and new additions to our wide range of high performance Vibratory Hammers.
Read more about our latest innovative upending Vibratory Hammers
0 years
experience
in construction equipment
0 years
experience
in offshore Vibratory Hammers
0 types
already equiped
with this tilting mechanism to upend a pile
5 reasons to choose for Dieseko Group Upending solutions
- Highly efficient
- Huge time savings, thus cost savings
- Makes your machine suitable for multiple applications
- Saves additional tilting equipment
- Reducing deck space on the vessel
Vibro technology is a proven method for fast and accurate pile driving.
A Vibratory Hammer is made up of a vibrating gear case connected by elastomers to the suppressor head. The top part of the hammer does not vibrate and can be safely hoisted by a crane. The vibratory hammer is a mechanical sine-wave oscillator with weights rotating eccentrically in opposite directions. The effect of the vibrations is an oscillating vertical force classified to frequency and amplitude. Vibratory hammers work by eliminating soil resistance acting on the pile.
Here is explained how a Normal Frequency Vibratory Hammer works
Want our expertise? Connect with us!

Michiel Schaminée
Area Manager Benelux

Martijn Schols
Director Sales International & Offshore
applications
- General driving and extraction of steel piles and casings
- Onshore, harbour and offshore
- Initiation/Start-up piles
- Jacket installation
- PLEM installation
- Conductor installation
- Decommissioning of offshore structures

Our innovations are driven by our customers needs and our desire to provide solutions with tangible benefits. A major breakthrough, patented, Dieseko innovation is the upending idea. We developed an add-on upending mechanism applicable for most types of Vibratory Hammers.
Upending and driving in one sequence
Due to tilting, the vibratory hammer is able to clamp onto a horizontally stored pile, to lift the pile and, to drive the pile vertically without any other handling operations.
- Highly efficient
- Huge time savings, thus cost savings
- Makes your machine suitable for multiple applications
- Can be applied both onshore and offshore
Our newly build PVE 500MU is a perfect exemple of this innovation. And also, our enormous PVE 2000 Giant, which is currently built, is equipped with an upending system. This machine will install huge offshore wind foundation monopiles up to 900 tonnes.

PVE 500MU passed the DNV offshore classification test

PVE 110MU Driving tubes for LNG terminal in Kitimat, Canada
