Now that the industry has recognized the advantages of this technology, the development of vibrating solutions has accelerated enormously. Vibro technology benefits offshore foundations because of its installation speed and handling and is increasingly changing offshore foundation methods. About 15 years ago, Dieseko installed the first anchor piles in submarine soil. Shortly afterwards, Dieseko started coupling vibratory hammers in tandem for more power to install monopiles.
Dieseko’s patented Upending concept was already introduced in 2012 on the Global Tech I wind farm.
In 2011, Dieseko manufactured the PVE 300M, the biggest vibratory hammer ever built. In 2012 this vibratory hammer was made tiltable so that it could up-end piles and used very successfully in the Hochtief Wind project.