Brief history of Dieseko Group
- 1974 – Founding Dieseko – Bolnes
-
1977 – Founding ICE – Amsterdam as an importer of American vibratory hammers
-
1978 – Dieseko moves to Papendrecht and becomes a dealer of foreign vibratory hammers
-
1979 – ICE produces first vibratory hammer
-
1983 – Dieseko moves to Sliedrecht where it is still based
-
1983 – ICE equipment is used on the construction of the Delta Works
-
1985 – Dieseko focuses on its own manufacturing plant: VIP – Versluis Industrial Products
-
1989 – Dieseko launches PVE
-
1990 – ICE part of Geveke
-
1992 – Introduction of PVE 2320VM the first Variable Moment Vibratory Hammer
-
1995 – Dieseko opens a branch in the USA
-
1995 – ICE expands its dealer network to 32
-
1996 – The PVE ringvibrator is introduced
-
2001 – The huge PVE 200M is introduced and directly put to work on the construction of the Betuwelijn
-
2004 – Active Share takes over ICE
-
2005 – ICE products active in Dubai for Palm Island
-
2007 – ICE wins Gazelle award for the second time in a row
-
2008 – Founding of Dieseko Group BV – PVE and ICE merge and they join forces
-
2009 – Developing the 200M ‘twin’ for the constructions of wind farms
-
2009 – The PVE 200M active in Bard1 offshore project
-
2010 – PVE 300M, Dieseko Group once again introduces the biggest vibratory hammer in the World
-
2010 – With the establishment of ICE China in Shanghai a fully owned rental fleet comes available
-
2010 – With the Vibroflot, a new product is added to the range
-
2011 – A rental fleet is established in Brazil
-
2012 – The award for ”Best Managed Companies” is won again
-
2012 – Dieseko Group provides two sets of the PVE 300 MU upending vibratory hammer, to the prestigious Global Tech wind farm in Germany
-
2013– Dieseko Group introduces the variable moment into China and Brazil– Introduction of the modular offshore hammer PVE “Giant”– Introduction of a patented start-stop system– NPM Capital, a subsidiary of SHV acquires a majority stake in Dieseko Group
-
2014 – Dieseko Group celebrates 40th anniversary
-
2014 – Introduction of PVE 500M, the world’s biggest monobloc vibratory hammer
-
2015 – Dieseko Group acquires PVE Piling & Drilling Rigs.
-
2015 – Dieseko shows the world a new pile driving technology. In cooperation with RTI, Dieseko Group develops the Resonator.
-
2015 – PVE PDR builds the largest rig in its history: the PVE 300PD.
- 2016 – Dieseko acquires Woltman Piling Equipment and founds:Woltman Piling & Drilling Rigs
- 2017 – From april Dieseko Group is worldwide supplier of Bell Dredging Pumps and amphibious dredgers
- 2017 – The huge PVE 500M decommissioned the Lely wind turbines
- 2018 – Dieseko Group acquires majority interest in Pilequip Australia
- 2019 – Mr Dirk Smulders Chairman of the Board/CEO
- 2019 – Introduction of the Side Gripper
- 2019 – Introduction of the noise mitigation screen
- 2020 – Dieseko launches the Frog: a vibrator plate for ground improvement
– PVE 110MU upending vibratory hammer installs 400 piles in Canada
– Dieseko ESG program approved
– Introduction of Dieseko Academy - 2021 – Launching the Founding the Future campaign
– Dieseko Group invests in a zero-emission program
– Successful test and DNV-certification of the 500MU Upending/lifting Vibratory Hammer. - 2021 – Dieseko Offshore has secured a contract with Saipem for the supply of the 2000MU Vibratory Hammer used to install
the monopiles on the Calvados Offshore Wind Farm - 2021 – Start of the manufacturing of the newly designed 2000MU
- 2022 – Woltman builds the first 90DRe. An electric powered Drilling Rig
- 2023 – With the PVE 700e, our first zero emission Electric Hydraulic Power Unit, several kilometres of sheet piles were driven next to a river.
– Introduction of the PLD100T Pile Lifting Device.