E-solutions are of great importance for the execution of our sustainability strategy. Dieseko Group has already introduced sustainable initiatives such as manufacturing OEM electric-hydraulic and low-emission power packs, using our i-Timer stop-start system and the use of a Remote Monitoring System. Today, Dieseko Group is developing and manufacturing game-changing, zero-emission foundation equipment as the ultimate contribution to emission-free construction sites.
Dieseko Group and Woltman demonstrated some of our strategies at the Zero Emission Demo Days by exhibiting our 90DRe electric Drilling Rig and the 700e EHPU, and explaining some of the challenges of electrification.
For more information, you can watch the following video:
BAM deploying the new Woltman 90DRe at Schiphol Airport.
The biggest challenge in sustainability
We’re seeing an increasing interest from the construction industry to either provide new foundation equipment or to modify existing foundation equipment that complies with low or zero-emission requirements. Looking after our next generation is a mutual responsibility of the entire construction industry. Together, we can transfer zero-emission ambitions into reality; we can act now.
Dieseko Group is ready to support you with low and zero-emission solutions for your foundation equipment and already has emission-free foundation equipment available.
Strategic Partnerships
For the development of zero-emission innovations, Dieseko Group collaborates with industry experts.
By developing with the joint expertise of specialists in equipment, battery technology, electronic control, and drive technology, Dieseko Group can distinguish itself with high-quality and unique solutions. With this knowledge, we can further implement our sustainability strategy, ‘Founding the Future’.
0% emission - 100% electric
Jolanda van den Brink
Sales Director
Sander Prent
Site Manager Woltman
Project
News
News
The new electric Drilling Rig now also has an adapted dashboard for energy- and battery levels