The sheet piles are accurately positioned by the piling frame, by interlocking the sheet piles before driving a panel is formed, so instead of worrying about the verticality of each pile while driving, the operator can proceed without the need of adjustment during the installation of the pile wall.
Location
Macao
Equipment
ICE 815D Vibratory Hammer & 600 Power Pack
Works
Construction pit for municipal utility tunnel
Sheet piles
24m long No. 6 sheet piles