The new quay, which connects to an existing quay, creates a quay with a total length of 1200. Various types of seagoing vessels with a draft of up to 14.5 meters can moor there, as can inland vessels. The new quay will be used for the transshipment of dry bulk goods: raw materials, organic agricultural products, as well as for rubble stones that are used for the reinforcement of offshore wind turbines.
The quay wall consists of 240 tube piles, interspersed with AZ-700 sheet piles, secured by 600 screw injection anchors. The tube piles were installed first with the help of a guide frame. The tubes are 38m long 1800mm diameter casings were pre-piled with a leader guided 2350VM (50VM) fitted with 4 tube clamps. The 1600PP was mounted on the back of the crane. An IHC-280 hydraulic hammer was used to drive the tubes to depth.