- Time saving
- Hydraulically & mechanically integrated
- Single winch operation
Features Pile Handling Device
- The PHD is mounted on the suppressor housing
- The pile is connected to and lifted by the PHD via a chain
- Automatically clamp alignment
- The PHD is suitable for most Vibratory Hammers
- Ease pile clamping, even on > 20m height
- The PHD has a lifting force of 200kN
- The weight of the PHD is 880kg
About Pile Handling Device
The Pile Handling Device (PHD) is fixed on the extraction head of the Vibratory Hammer, and is connected to the positioning hole on the pile by a chain. The pile head is automatically lifted into the clamping plate of the fixture through the lifting of the hydraulic cylinder, realizing the function of pile alignment. This process only takes about 1 minute (speed can be adjusted according to customer needs). This system improves the efficiency of the pile.
The system requires a separate hydraulic system, integrated in the Power Pack.
Get in touch with us
Jos Hardeman
Senior Sales Area Manager - Mid-Europe, Scandinavia, UK
Michiel Schaminée
Area Manager Benelux