New commercial pier in Portimão, Portugal

Started in April 2020, Portuguese engineering and construction company Mota Engil drove 12 casings for the foundation of the 3 Duques D’alba. This is a future commercial pier in Portimão.

The casings, 1100mm in diameter and 11 mm thick, were driven in the seabed at a depth of 21 meters. The vibratory hammer used was a PVE52M normal frequency vibratory hammer, supplied by PERTA our Portuguese dealer. Despite the complexity of the work, the total duration of the project was only 1 month and 15 days, thanks to the good performance of the PVE 52M.

In the sliders below pictures of the job and the final result.

Job data

JOB
Marina De Portimão
CLIENT
Mota Engil
EQUIPMENT
PVE 52M + ICE 900 + 2x PVE 100TC
TUBES
Ø=1100mm, length = 21m,  thickness = 11mm
SPT MAXIMUM SPT
33, 44, 50, 51, 60

PRODUCTS FEATURED IN THIS PROJECT:

ICE 900PP

ICE 900 Volvo STAGE – / TIER 2

ICE 900 Volvo Stage –