Pile Lifting Device PLD100T

Request for quotation

Request

Features Pile Lifting Device PLD100T

  • The PLD is mounted on the suppressor housing
  • The pile is connected to the PLD via a chain
  • The pile is lifted into the clamps by cylinders
  • Automatically clamp alignment
  • The PLD is suitable for a wide range of Vibratory Hammers
  • Even with very long pipe piles
  • The PLD has a linepull of 105500 kg
Datasheet

About Pile Lifting Device PLD100T

Sequence:

  1. Hook up the pile while it is laying on the ground with shackles connected to a hole in the pile.
  2. Upend the pile to a vertical position.
  3. Lower the vibratory hammer onto the pile by sending out the cylinders.
  4. Clamp the clamps onto the pile
  5. Rise the PLD together with the vibratory hammer by retracting the cylinders. Chains/slings will lose its tension.
  6. Drive the pile into the soil.
  7. Unhook the pile.

 