Search...

Search

Mierzeja Spit Project Poland

Dieseko foundation equipment a hot topic in magazines.
The Polish-Belgian consortium NDI and Besix will construct a new waterway connecting Gdańsk Bay to the Vistula lagoon. The consortium will build a port, a channel along with waiting positions from the side of the Gulf of Gdańsk and, an artificial island. Dieseko Poland is supplying several Vibratory Hammers, Impact hammers and Dredging pumps. Due to the environment and due to installation speed this foundations equipment is a hot topic and used for covers and publications in Geotechnical Magazines: GDMT03_DiesekoPoland

The Polish-Belgian consortium NDI and Besix will construct a new waterway connecting Gdańsk Bay to the Vistula lagoon. The consortium will build a port, a channel along with waiting positions from the side of the Gulf of Gdańsk and, an artificial island. Dieseko Poland is supplying several Vibratory Hammers, Impact hammers and Dredging pumps. Due to the environment and due to installation speed this foundations equipment is a hot topic and used for covers and publications in Geotechnical Magazines: GDMT03_DiesekoPoland